Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the verve domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the verve domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
West Palm Beach Waterfront - Singer Studio
logo
logo

West Palm Beach Waterfront

West Palm Beach, Florida

Singer Studio was selected as a part of an integrated design team to lead the re-imagining and design of the new West Palm Beach Waterfront. The Waterfront is over a 1/2 mile long and encompasses over 12.5 acres along the Intracoastal Waterway. The new civic space revitalizes the City’s historic downtown and restores the natural beauty of West Palm Beach’s waterfront. The Studio designed the main commons and event spaces, 3 new floating docks, shaded gardens, two community buildings, a continuous waterfront esplanade, shade trellises, custom benches, 7 water elements and an estuarine ecological regeneration area known as the South Cove. The $30 million park (with $9 million of that coming from Federal, State and Local grants) opened in early 2010, with an estimated 80,000 people attending the grand opening celebration.

The design relocated the Public Library from the base of Clematis Street, opening waterfront views and views of Palm Beach Island, and access to a large public commons green space. Shaded garden pathways along both North and South Clematis Streets have several unique sculptural water gardens. The main central space of the commons was designed to accommodate major downtown events such as the Palm Beach Boat Show, Sunfest and the 4th on Flagler. The Landing and Beach areas result from repositioning Flagler Drive west to gain more public access to the water’s edge. The Beach area consists of recycled concrete fines paving, mature coconut palms and pockets of seating nestled into swathes of native vegetation. The Esplanade consists of several discreet spaces including intimate seating areas and small ‘rooms’ along a continuous bike and pedestrian path. Existing trees were saved and some were transplanted from the old library site to create a more varied and mature shade canopy along the Beach and Esplanade.

Artist and Lead Designer: Michael Singer
Singer Studio Project Manager and Environmental Designer: Jason Bregman
Singer Studio Team Designers: Jonathan Fogelson, Dolores Root, Husayn El Sharif and Itai Singer
Landscape Architecture: Carolyn Pendleton Parker at Sanchez & Maddux Inc. and Connie Roy- Fisher
City Project Manager: Joan Goldberg
Architect of Record: Steve Boruff Architects
Lighting Design: Barbara Horton and Lee Brandt at HLB Lighting
Planning: Ana Aponte, Amy Stelly, and Matt Flis from the West Palm Beach City Planning Department
and the Thompson Design Group (concept and initial planning)
Construction: Catalfumo Construction, Whiting Turner and Technomarine (Living Docks), Mancon
Construction (Flagler Drive), Wesco (fountains)
Design Criteria Phase Project Lead and Initial Site Engineering: CH2M Hill
Photography: David Stansbury, Michael Singer, Tom Hurst (Dock photography),
Aerials courtesy of Catalfumo Construction